---
title: "Panther Metals Expands Wishbone Drilling After Multiple Sulphide Intersections"
publisher: "Stockmark.IT"
author: "Stockmark.IT Website"
published: "2026-07-12T08:36:57+00:00"
modified: "2026-07-12T08:36:57+00:00"
date: 2026-07-12
canonical: "https://stockmark.it/panther-metals-expands-wishbone-drilling-sulphide-intersections/"
category: "Mining"
categories: ["Mining"]
tags: ["PALM", "Panther Metals", "Zinc"]
image: "https://stockmark.it/wp-content/uploads/2026/07/PALM-with-title-2.avif"
format: "news"
language: "en-GB"
---

# Panther Metals Expands Wishbone Drilling After Multiple Sulphide Intersections

**Published:** July 12, 2026
**Author:** Stockmark.IT Website
**Categories:** Mining
**Tags:** PALM, Panther Metals, Zinc
**Featured image:** ![A mining site by a river at sunset, with machinery, drill, soil samples, rocks, and the Panther Metals logo in the top left corner. Forest and mountains are visible in the background, highlighting ongoing Wishbone drilling activities aimed at identifying potential sulphide intersections in this mineral-rich landscape. @ stockmark.it](https://stockmark.it/wp-content/uploads/2026/07/PALM-with-title-2.avif)

---

> Panther Metals is adding a second drill rig at Wishbone after the first two holes intersected multiple zones of massive and semi-massive sulphide mineralisation.

**Panther Metals i**s expanding its Phase 1 drilling programme at the** Wishbone prospect **in Ontario after the** first two holes intersected multiple zones of massive and semi-massive sulphide mineralisation.**

Panther Metals Plc (LON: PALM) said its drilling contractor is commissioning a second diamond-core rig for mobilisation to the Obonga Project from Manitoba. The additional capacity is expected to accelerate exploration beyond the original 2,000-metre drilling budget.

The first hole, BR26-WB-P1-1, reached 300 metres and intersected nine visually identified sulphide zones between 77.75 metres and 245 metres downhole. These included 3.45 metres of pyrrhotite-dominated massive sulphide and 9.9 metres of semi-massive sulphide. The second hole, BR26-WB-P1-2, also intersected the targeted volcanogenic massive sulphide horizons along strike.

Further pads have been prepared and a fifth is expected to be ready before the second rig arrives. Panther cautioned that the new core has not yet been cut, sampled or laboratory assayed, so the current observations remain visual.

Adding a second rig signals management confidence in the emerging geological model and increases the pace at which Panther can test the potential scale of the Wishbone system. The key next catalyst will be laboratory assays, which are required to establish grades and determine whether the visually logged sulphides translate into economically meaningful mineralisation.

## Company details

- **Company:** Panther Metals Plc

- **Ticker:** LON: PALM

- **Sector:** Mining

- **Commodities:** Zinc, silver and base metals

- **Project:** Wishbone prospect, Obonga Project, Ontario

- **Release time:** Not stated by the secondary source

**Source:** Share Talk, 10 July 2026, based on the company drilling update.

---

**Original URL:** https://stockmark.it/panther-metals-expands-wishbone-drilling-sulphide-intersections/
*Created by [WP Markdown Endpoint](https://wpmarkdownendpoint.com/)*
